I have a great 12 volt fan that I can use but am not convinced that I need it. So we created a spot for it, wired it and then filled it with insulation, took some good pictures and then will seal it up and can go back and cut it out if needed. I will install the thermostat after we have put up the Tongue and Groove.


After installing the interior plywood we went in and moved all the plug boxes out the appropriate depth. I then went through and sprayed some foam insulation to seal those areas. As you can see I was a little more robust on the foam then I really needed to be but it is pretty easy to cut the excess off and I am very close to installing the hardware once the T&G is in place.
We are 95% done on the sheeting. The next step is getting the shower in place. Once we get that in place we will plumb the water and propane. This is progress!


Next weekend is building the deck weekend back in Dundee, OR. I am excited to see how that turns out. The move to Dundee is still scheduled for September 18th, 2011.

1 comment:

  1. This is looking GREAT! I am making plans for mine now, your blog is so inspiring. I know it is a lot of work to keep it up - be there are more of us keeping check than you can imagine!

    Do you know what the weight is now? What dry weight are you aiming for?